水利水電工程抗震設防標準范文
時間:2023-07-06 17:42:08
導語:如何才能寫好一篇水利水電工程抗震設防標準,這就需要搜集整理更多的資料和文獻,歡迎閱讀由公文云整理的十篇范文,供你借鑒。
篇1
關鍵詞:水利水電工程;水電站;選址;總體布置;主要建筑物
Abstract: water conservancy and hydropower engineering design of the project location, engineering overall arrangement and the main buildings in the writing process should be seriously in investigation, exploration, test, study, obtain reliable basic material. Design should be safe, reliable, and advanced technology, combined with the actual, saving investment, pay attention to the economic benefit; Also should have the analysis, argumentation, have the necessary project, and have a clear conclusion and suggestion. Through the GuXing hydropower station, the feasibility study report of the construction of the location, the engineering TiZong arrangement and the writing of the main building, the more objective and comprehensive to each and every one of the main content and the depth requirements expression comes out.
Keywords: water conservancy and hydropower projects; Hydropower station; Location; The overall layout; The main building
中圖分類號:TV文獻標識碼:A 文章編號:
前 言
在水利水電工程項目的設計過程,尤其在可行性研究報告及初步設計報告的編寫中,將根據(jù)江河流域(河段)規(guī)劃,區(qū)域綜合規(guī)劃或水利水電專業(yè)規(guī)劃的要求,對工程項目的建設條件進行調(diào)查和必要的勘測,在可靠資料的基礎上,在可行性研究報告和初步設計報告的主要內(nèi)容和深度要求中進行工程選址、工程總布置及主要建筑物的確立及編寫尤其重要,以下談談古興水電站應如何工程選址、工程總體布置及主要建筑物。
1 工程等別和標準
1.1 工程等別及建筑級別
古興水電站以發(fā)電為主,總裝機容量為5000kW,校核洪水位時的總庫容為588.12萬m3。按照《水利水電工程等級劃分及洪水標準》SL252-2000的規(guī)定,工程屬Ⅳ等工程,小(Ⅰ)型規(guī)模。電站的永久建筑物(攔河壩、泄水建筑物、廠房)均按4級建筑物設計,導流圍堰等臨時工程按5級建筑物設計。
1.2 洪水標準
根據(jù)《水利水電工程等級劃分及洪水標準》規(guī)定,電站建筑物的洪水標準如表1所示。
表1 洪水標準
建筑物 設計洪水重現(xiàn)期(年) 校核洪水重現(xiàn)期(年)
攔河壩、泄水建筑物、廠房 30 200
1.3 設計基本資料
水文氣象
古水河流域自上游至下游主要氣象參數(shù)為:多年平均氣溫20.8℃~20.7℃,最高氣溫39.1℃~39.4℃,最低氣溫-3.9℃-4.2℃.多年平均相對溫度81%,多年平均風速0.9~1.1m/s,最大風速13~5.3m/s。
2 工程選址
古興水電站壩址的選擇受下游蒙坑電站正常水位的制約,沒有較多壩址作比較,考慮到上游已建成的大良水電站壩址、梯級電站的水位銜接等,選擇上壩址和下壩址兩個方案比較。上壩址位于下距舊電站100m上游,下壩址位于上壩址下游50m。
2.1 上壩址方案
2.2.1 地形、地質(zhì)條件
壩址河床呈不對稱的“U”型。河流呈“S”形急轉(zhuǎn)彎后再折向SW,河道彎曲。壩軸線走向取205°。河床砂礫石層厚約4m,左岸為土質(zhì)岸坡,右岸為淺部發(fā)育強風化巖。
2.1.2 工程型式、布置
上壩址方案擬于竹黎村正對面河段修筑攔河壩,并在河床上處布置廠房及附屬建筑物,屬河床式開發(fā)方案。廠房布置在河流左岸,攔河壩布置在右岸。
2.2 下壩址方案
2.2.1 地形、地質(zhì)條件
下壩址位于上壩址下游約50m處。下壩址河床呈不對稱的“U”型,左岸坡角45°~55°,右岸坡角約5°~25°。壩軸線方向為285°,河床寬約75m??菟?7m時,水面寬約40m,水深1~3.5m。
2.2.2 工程型式、布置
工程在河左岸筑壩擋水,河床的右岸布置廠房和附屬建筑物,屬河床式開發(fā)方案。
2.3 壩址比較和方案選擇
上壩址河床相對寬闊,有利于布置廠房等建筑物,上部松散覆蓋層厚度不大,河床基巖埋深較淺,基巖面較平坦且較容易開挖。下壩址右岸河岸邊強~弱風化基巖, 開挖量大,工程投資大,而且廠房布置接近原來的公路,升壓站的布置比較困難。
綜上所述,上壩址優(yōu)于下壩址。建議選擇上壩址。
3 壩型選擇
壩址處河面較窄,正常蓄水位50.1m時,寬度為60~65m,而洪峰流量相對較大,設計洪水洪峰流量2473m3/s。校核洪水洪峰流量3495m3/s,洪水宜從河床渲泄,因此,擋水、泄水建筑物采用重力式。壩體采用混凝土型式。
4 樞紐布置選擇
本電站水頭較低,選定壩址處沒有引水或其他布置的地形條件,所以廠房采用河床式布置。樞紐為河床式電站,由攔河壩、廠房、升壓站等建筑物組成。
4.1.1 攔河壩
攔河壩由溢流壩、非溢流壩組成。河床絕大部分被溢流壩及河床式廠房占用。
(1)、溢流壩
1)溢流壩布置
溢流壩全長50m,設5扇弧形鋼閘門,閘門的尺寸為:10×8m(寬×高),堰體為WES標準剖面的實用堰,堰頂高程為42.50m,堰高8.5m,上游堰面曲線采用橢園方程:
2)泄流能力
閘門全開后,沖沙孔拉開泄洪,沖沙孔的泄洪能力用閘孔出流公式計算,根據(jù)上述計算表和沖沙孔泄洪計算成果點繪出古興電站壩上Z~Q關系曲線圖。
本水電站為徑流式水電站,根據(jù)電站的壩上Z~Q關系曲線圖查得,設計洪水位為52.30m,校核洪水位為54.80m。
4.1.1.1壩頂高程
壩頂高程的確定,是在各種運行情況水庫靜水位加對應風浪高程和安全超高中選取最大值。
壩頂至水庫靜水位的高度的計算公式為:
Δh=2hL+ho+hc
表2 壩頂高程計算成果單位:m
上述成果表明,壩頂高程由校核洪水位控制,定為56.30m,最大壩高22.70m,壩頂長度 62.00m。
4.1.1.2 消能設計
根據(jù)下游水位較高的情況,采用底流式消能。根據(jù)計算,消力池的長度為30m,護坦的長度為10m,堆石防沖段長20m。岸坡采用護坡處理,其護砌長度29m,護坡頂高程為10年一遇洪水位。
4.1.2 廠房及變電站
4.1.2.1 廠房布置概述
廠房布置在河床右側(cè),裝機2臺,總裝機容量5000kW,為河床式廠房,其主要尺寸(長×寬×高)為23.7m×19.5m×16.5 m,其安裝高程41.20m,水輪機層高程 44.225m,發(fā)電機高程48.7m,尾水管底高程34.91m,屋頂面高程65.20m,設50t/10t橋式吊車1臺,廠房進口設防洪門。
進水口設攔污柵及檢修門各1道,門機啟閉。各設快速主閘門1道,固定式啟門機啟閉。
穩(wěn)定計算
上游底板高程37.14m,下游底板高程33.41m。假定滑動面為廠房基底面。根據(jù)地質(zhì)報告,取f=0.45。
計算公式:k=
抗滑抗傾的穩(wěn)定計算成果如表3。
廠房地基面上的垂直正應力(計入揚壓力)控制(按材料力學公式)。
σMax≤2500kN/m2σMin>0
表3 廠房整體抗滑穩(wěn)定性計算成果表
4.1.2.2 升壓站
升壓站布置在室外,高程53.00 m,面積為25m×18m,安裝1臺主變壓器,主變?nèi)萘繛?300kVA,35kV出線1回。
結(jié)語:
水利水電工程的可行性研究和初步設計的工程選址、工程總體布置及主要建筑物是編寫過程中主要體現(xiàn)建筑物和工程布置的一項主要的、不可缺少的重要內(nèi)容,應認真進行調(diào)查、勘察、試驗、研究,取得可靠的基本資料。設計應安全可靠,技術先進,密切結(jié)合實際,節(jié)約投資,注重經(jīng)濟效益;還應有分析,論證,有必要的方案,并有明確的結(jié)論和建議。
參考文獻:[1]水利水電工程可行性研究報告編制規(guī)程。中華人民共和國電力工業(yè)部,1993-0901實施
[2] 《水利水電工程等級劃分及洪水標準》SL252-2000的規(guī)定
篇2
關鍵詞:混凝土質(zhì)量控制配合比混凝土養(yǎng)護
混凝土由于自身的特殊性能在現(xiàn)代土建工程上發(fā)揮著重要作用。其特殊性能體現(xiàn)在:具有較高的強度及耐久性;混凝土拌制物具有可塑性;能與鋼筋牢固的結(jié)合成堅固、耐久、抗震且經(jīng)濟的鋼筋混凝土結(jié)構(gòu)。但是混凝土材料品質(zhì)及配合比質(zhì)量的波動以及混凝土輸送、澆筑、養(yǎng)護等施工工藝對混凝土質(zhì)量有較大的影響,施工過程中需要嚴格的質(zhì)量控制。
一、混凝土材料質(zhì)量控制
(一)水的質(zhì)量要求
凡可以飲用的水均可用于拌制和養(yǎng)護混凝土。未經(jīng)處理的工業(yè)廢水,污水及沼澤水不能使用,對鋼筋混凝土及預應力混凝土工程不允許使用海水。拌制混凝土用水還應符合下表要求。
拌制混凝土用水的質(zhì)量控制
項目
指標
含有影響水泥正常凝結(jié)和硬化的油類,糖類或其他有害雜質(zhì)
不允許
PH值不小于
4
硫酸鹽,折成SO4,其含量不大于
1%
(二)水泥的質(zhì)量控制
水泥品種較多,按用途和性能分為通用水泥、專用水泥及特種水泥。通用水泥主要用于一般土建工程。包括硅酸鹽水泥、普通硅酸鹽水泥、礦渣硅酸鹽水泥、火山灰質(zhì)硅酸鹽水泥、粉煤硅酸鹽水泥以及復合硅酸鹽水泥。在使用水泥的時候必須區(qū)分水泥的品種及強度等級掌握其性能和使用方法,根據(jù)工程的具體情況合理選擇與使用水泥,這樣既可提高工程質(zhì)量又能節(jié)約水泥。
在施工過程中還應注意以下幾點:
(1)優(yōu)先使用散裝水泥。
(2)運到工地的水泥,應按標明的品種、強度等級、生產(chǎn)廠家和出廠批號,分別儲存到有明顯標志的倉庫中,不得混裝。
(3)水泥在運輸和儲存過程中應防水防潮,已受潮結(jié)塊的水泥應經(jīng)處理并檢驗合格方可使用。
(4)水泥庫房應有排水、通風措施,保持干燥。堆放袋裝水泥時,應設防潮層,距地面、邊墻至少30CM,堆放高度不得超過15袋,并留出運輸通道。
(5)先出廠的水泥先用。
(6)應避免水泥的散失浪費,作好環(huán)境保護。
(三)骨料的質(zhì)量控制
砂石骨料是混凝土最基本的組成成分。通常1立方米的混凝土需要1.5立方米的松散砂石骨料。所以對混凝土用量很大的水利水電工程,砂石骨料的需求量是很大的,骨料的質(zhì)量好壞直接影響混凝土強度、水泥用量和混凝土要求,從而影響水工建筑物的質(zhì)量和造價。為此,在水利水電工程施工中應統(tǒng)籌規(guī)劃,認真研究砂石骨料儲量、物理力學指標、雜質(zhì)含量及開采、儲存和加工等各個環(huán)節(jié)。
使用的骨料應根據(jù)優(yōu)質(zhì)、經(jīng)濟、就地取材的原則進行選擇??梢赃x用天然骨料、人工骨料,或者互相補充。選用人工骨料時,有條件的地方宜選用石灰?guī)r質(zhì)的料源。
1骨料料場規(guī)劃
骨料料場的合理規(guī)劃是骨料生產(chǎn)系統(tǒng)的設計基礎,是保證骨料質(zhì)量、促進工程進展的有力保障。
骨料料場規(guī)劃的原則
(1)滿足水工混凝土對骨料的各項質(zhì)量要求,其儲量力求滿足各設計級配的需要,并有必要的富裕量。
(2)選用的料場,特別是主要料場應場地開闊,高程適宜,儲量大,質(zhì)量好,開采季節(jié)長,主輔料場應能兼顧洪枯季節(jié)互為備用的要求。
(3)選擇可采率高,天然級配與設計級配較為接近,用人工骨料調(diào)整級配數(shù)量少的料場。
(4)料場附近有足夠的回車和堆料場地,且占用農(nóng)田少。
(5)選擇開采準備量小,施工簡便的料場。
2骨料的質(zhì)量要求包括:強度、抗凍、化學成分、顆粒形狀、級配和雜質(zhì)含量。骨料分為粗骨料和細骨料。
粗骨料質(zhì)量要求:
(1)粗骨料最大粒徑:不應超過鋼筋凈距的2/3、構(gòu)件斷面最小邊長的1/4、素混凝土板厚的1/2。對少筋或無筋的混凝土結(jié)構(gòu),應選用較大的粗骨料粒徑。
(2)在施工中,宜將粗骨料按粒徑分成下列幾種粒徑組合:當最大粒徑為40mm時,分成D20、D40兩級;當最大粒徑為80mm時,分成D20、D40、D80三級;當最大粒徑為150(120)mm時,分成D20、D40、D80、D150(D120)四級;
(3)應控制各級骨料的超、遜徑含量。
(4)采用連續(xù)級配或間斷級配,應由實驗確定。
(5)粗骨料表面應潔凈,如有裹粉、裹泥或被污染等應清除。
(6)粗骨料的其它品質(zhì)要求見下表:粗骨料的品質(zhì)要求
項目
指標
備注
含泥量
%
D20D40粒徑級
≤1
D80,D150(D120)粒徑級
≤0.5
泥塊含量
不允許
堅固性
%
有抗凍要求的混凝土
≤5
無抗凍要求的混凝土
≤12
硫化物及硫酸鹽含量%
≤0.5
折算成SO3,按質(zhì)量計
有機質(zhì)含量
淺于標準色
如深于標準色,應進行混凝土強度對比實驗,抗壓強度比不應低于0.95
表觀密度kg/m3
≥2550
吸水率%
≤2.5
針片狀顆粒含量%
≤15
經(jīng)實驗論證,可以放寬至25%
細骨料質(zhì)量要求:
(1)細骨料應質(zhì)地堅硬、清潔、繼配良好;人工砂的細度模數(shù)宜在2.4-2.8范圍內(nèi),天然砂的細度模數(shù)宜在2.2-3.0范圍內(nèi)。使用山砂、粗砂、特細砂應經(jīng)實驗論證。
(2)細骨料的含水率應保持穩(wěn)定,人工砂飽和面干的含水率不宜超過6%,必要時應采取加速脫水措施。
(3)細骨料的其它品質(zhì)要求見下表:
細骨料的品質(zhì)要求
項目
指標
備注
天然砂
人工砂
含泥量
%
≥和抗凍要求的
≤3
く
≤5
泥塊含量
不允許
不允許
堅固性
%
有抗凍要求的混凝土
≤8
≤8
無抗凍要求的混凝土
≤10
≤10
硫化物及硫酸鹽含量%
≤1
≤1
折算成SO3,按質(zhì)量計
有機質(zhì)含量
淺于標準色
不允許
表觀密度kg/m3
≥2500
≥2500
云母含量%
≤2
≤2
輕物質(zhì)含量%
≤1
經(jīng)實驗論證,可以放寬至25%
石粉含量%
6---18
二、混凝土配合比
混凝土施工配合比必須通過實驗,滿足設計技術指標和施工要求,并經(jīng)審批后方可使用?;炷潦┕づ淞媳仨毥?jīng)審核后簽發(fā),并嚴格按簽發(fā)的混凝土施工配料單進行配料,嚴禁擅自更改。在施工配料中一旦出現(xiàn)漏配、少配或者錯配,混凝土將不允許進倉。
三、混凝土的攪拌及輸送質(zhì)量控制
根據(jù)工程量的大小并結(jié)合施工單位自身設備條件選取相應的拌和設備和運輸設備。提前預測拌和設備和運輸設備可能出現(xiàn)的故障和問題,并及時安排機修人員作好設備的檢查和修理工作。不能因為設備故障而停止混凝土的澆筑,確保在施工過程中及時提供工程所許混凝土,促進工程有序向前推進,保證施工進度。
1混凝土拌和質(zhì)量控制要點
(1)混凝土最小拌和時間
拌和容量Q(立方米)
最大骨料粒徑(mm)
最少拌和時間(s)
自落式拌和機
強制式
0.8≤Q≤1
80
90
60
1<Q≤3
150
120
75
Q>3
150
150
90
注:①入機拌和量應在拌和機額定容量的110%以內(nèi)。
②加冰混凝土拌和時間應延長30s(強制式15s)
(2)在混凝土拌和中應定時檢測骨料含水量。
(3)混凝土摻和料在現(xiàn)場宜用干摻法,且必須拌和均勻。
(4)混凝土拌和物出現(xiàn)下列情況之一,按不合格處理。
①錯用配合比。
②混凝土配料時,任意一種材料計量失控或漏配。
③拌和不均勻或夾帶生料。
④出口混凝土坍落度超過最大允許質(zhì)。
2混凝土運輸過程注意事項
(1)運輸中不致發(fā)生分離、漏漿、嚴重泌水、過多溫度回升和坍落度損失。
(2)混凝土運輸時間:
運輸時段平均氣溫
混凝土運輸時間(min)
20—30
45
10—20
60
(3)5—10
(4)90
(4)低溫天氣應避免天氣、氣溫等因素的影響,采取遮蓋或保溫設施。
(5)混凝土的自由下落度不宜大于1.5m否者應設緩降措施,防止骨料分離。
(6)混凝土在運輸過程中如果出現(xiàn)故障,必須及時處理。在混凝土初凝前想辦法將混凝土運送到澆筑倉位否者以不合格處理。
四、混凝土澆筑、養(yǎng)護及拆模質(zhì)量控制
(一)混凝土的澆筑
混凝土澆筑前作業(yè)包括:基礎處理、施工縫處理、立模鋼筋及預埋件的安設。(其質(zhì)量要求參見《水工混凝土施工規(guī)范》)其次必須經(jīng)監(jiān)理人員驗倉合格,并取得準澆許可證方能進倉作業(yè)。
1入倉鋪料
混凝土入倉鋪料多采用平澆法,它是由倉面某一邊逐層有序連續(xù)鋪填。鋪料層的厚度與振動設備的性能、混凝土粘稠度、骨料強度和氣溫高低有關。
其具體要求參見下表:
振動設備
澆筑層厚度
插入式
振搗機
振搗棒頭長度1.0倍
電/風振搗器
0.8倍
軟軸式振搗器
1.25倍
平板式
單層鋼筋
250mm
雙層鋼筋
200mm
混凝土層間間歇超過混凝土初凝時間,會出現(xiàn)冷縫,使層間抗?jié)B、抗剪能力明顯下降,在施工過程中,其允許間歇時間:
混凝土澆筑氣溫
允許間歇時間(min)
中熱、硅酸、普通硅酸鹽水泥
低熱、礦渣、火山灰質(zhì)硅酸鹽水泥
20—30
90
120
10—20
135
180
(5)5—10
195
----
2平倉與振搗
卸入倉內(nèi)成堆的混凝土料,應平倉后再振搗,嚴禁以振搗代平倉。振搗時間以混凝土粗骨料不在顯著下沉,并開始泛漿為準。應避免欠振、過振使混凝土振搗均勻密實。其振搗具體要求參見《水工混凝土施工規(guī)范》
3澆筑中倉面出現(xiàn)下列情況之一應停止?jié)仓?/p>
(1)混凝土初凝并超過允許面積。
(2)混凝土平均澆筑氣溫超過允許偏差質(zhì),并在1小時內(nèi)無法調(diào)整至允許溫度內(nèi)。
(3)在澆筑過程中出現(xiàn)大雨或暴雨天氣。
4在施工過程中出現(xiàn)下列情況之一應挖出混凝土。
(1)不能保證混凝土振搗密實或?qū)λそㄖ聿焕绊懙募壟溴e誤的混凝土料。
(2)長時間凝固、超過規(guī)定時間的混凝土料。
(3)下到高等級混凝土澆筑部位的低等級混凝土料。
5在澆筑埋石混凝土的時候應該嚴格控制施工單位的埋石量、埋石大小并保證埋石潔凈以及埋石與模板的距離,杜絕施工單位為了單純提高埋石率而放棄質(zhì)量。在施工中努力確保埋石垂直和水平距離,以不影響振搗為原則,提高埋石混凝土質(zhì)量。
6澆筑完的混凝土必須遮蓋來保溫或者防雨。
五、混凝土的養(yǎng)護及拆模質(zhì)量控制
(一)混凝土的養(yǎng)護
為使混凝土中水泥充分水化,加速混凝土的硬化,防止混凝土成型后因曝曬、風吹、干燥、寒冷等自然因素的影響出現(xiàn)不正常的收縮、裂縫破壞等現(xiàn)象。混凝土澆筑完畢后應及時灑水養(yǎng)護保持混凝土表面濕潤。
混凝土表面的養(yǎng)護要求:
(1)塑性混凝土應在澆筑完畢后6-18h內(nèi)開始灑水養(yǎng)護,低塑性混凝土宜在澆筑完畢后立即噴霧養(yǎng)護,并及早開始灑水養(yǎng)護。
(2)混凝土應該連續(xù)養(yǎng)護,養(yǎng)護期內(nèi)必須確保混凝土表面處于濕潤狀態(tài)。
(3)混凝土養(yǎng)護時間不宜少于28d。
(二)拆模
拆模的遲早直接影響到混凝土質(zhì)量和模板使用周轉(zhuǎn)率。拆模時間應根據(jù)設計要求、氣溫和混凝土強度等級情況而定。對非承重模板,混凝土強度達到2.5Mpa以上,其表面和棱角不因為拆模而損壞方可拆除。對承重模板達到下表規(guī)定的混凝土設計標號的百分率后才能拆模。
懸臂板、梁
其它梁、板、拱
跨度≤2米
跨度>2米
跨度≤2
跨度2-8米
跨度>8米
70%
100%
50%
70%
100%
參考文獻
1水利工程施工武漢大學出版社
2混凝土工手冊中國建筑工業(yè)出版社李立全
篇3
[關鍵詞]河道治理;河堤設計;賓格石籠;抗滑
1 工程概況
某河道全長15.1km,其中部分段河道內(nèi)淤積嚴重,邊坡為土質(zhì)邊坡,水土流失嚴重,河道不滿足行洪要求。為進一步加大水土流失嚴重地區(qū)生態(tài)綜合治理力度,保護生態(tài)環(huán)境,擬對該河道進行生態(tài)綜合治理[1 ]。該河道生態(tài)綜合治理主要包含河道清淤防滲,河道兩岸防洪水位以下采用賓格石籠邊坡護砌,防洪水位以上采用草皮護坡。賓格石籠邊坡護砌1260m、草皮護坡5670m2 、栽植綠化樹木500 株;新建攔水壩5 座,20 年一遇的河道防洪設計標準,工程抗震設防烈度為Ⅶ度。
2 河堤設計
河道治理長度630m,河道斷面形式為梯形斷面,邊坡比1 ∶3 ,河道兩岸防洪水位以下采用賓格石籠邊坡護砌,防洪水位以上采用草皮護坡,河道上河口種植垂柳綠化,垂柳種植株距3m,擬種植垂柳500 株,垂柳胸徑7cm。
2.1 河道參數(shù)計算
式中:Rp為累計頻率為p的波浪爬高;KΔ為斜坡的糙率及滲透性系數(shù),砌石護面取0.8 ,草皮護面取0.9;Kv為經(jīng)驗系數(shù),根據(jù)風速v、堤前水深d及重力加速度g來確定;Kp為爬高累積頻率換算系數(shù);m為邊坡系數(shù);H-為平均波高;L為波長。將各值代入式(1),計算結(jié)果見表1 。河道設計底寬16m,邊坡高3m,設計水深2m,設計邊坡采用1 ∶3 土質(zhì)邊坡。
2.2 賓格石籠邊坡護砌
格賓籠又叫格賓網(wǎng),是由低碳鍍鋅覆塑鋼絲使用機械編織而成的六角形網(wǎng)箱結(jié)構(gòu)。網(wǎng)箱鋼絲主要由邊端和網(wǎng)面鋼絲組成,其類型和要求見表2 。所用鋼絲要求重鍍鋅覆塑,鍍鋅量要大于245g/m2 ,覆塑的厚度也應大于0.5mm,其抗拉強度要求在350 ~500MPa之間,延伸率應高于10%[4 ];格賓石籠內(nèi)填料重度應滿足18 ~19kN/m3 ,填石為大于MU30 的卵石或者硬質(zhì)巖質(zhì)塊石,粒徑在100 ~250mm較為合適。為確?;靥畹纳暗[不會流失,應在其格賓擋墻后設置無紡土工布,克重250 ~300g/m2 ,施工折邊大于0.3m[5 ]。見圖1 。組裝格賓的原則:形狀應規(guī)則,絞合相對牢固,所有豎直面板上邊緣要在同一水平面上,且確保面板上端水平邊緣與蓋板邊緣能夠絞合。石料填充務必均勻地向同一層各箱格內(nèi)放入填充料,單格網(wǎng)箱不能一次性投滿。填料施工時,應將每層的投料厚度控制在33cm上下,正常情況下1m高網(wǎng)箱應分3 到4 層投料。可根據(jù)土壤和氣候以及景觀的要求,選擇植被灌木或草種,網(wǎng)箱封蓋后,應將壤土在空隙處填滿,頂部填滿高約5cm壤土[6 ]。
3 邊坡穩(wěn)定與河道沖刷分析
邊坡穩(wěn)定分析包括施工完建期迎水面邊坡穩(wěn)定、穩(wěn)定滲流期形成穩(wěn)定滲流時的迎水面邊坡穩(wěn)定、水位降落期迎水面邊坡穩(wěn)定。采用《北京理正邊坡穩(wěn)定分析軟件5.11 版》瑞典圓弧法計算,對邊坡穩(wěn)定進行分析。根據(jù)《水工建筑抗震設計規(guī)范》(SL203 -1997),工程抗震設防類別為丙級,穩(wěn)定分析時地震烈度為7 度,地震動峰值加速度為0.10g。邊坡抗滑穩(wěn)定計算選用兩種典型斷面進行邊坡穩(wěn)定分析,需要的堤體土料物理力學指標按地質(zhì)報告提供數(shù)據(jù)[5 ]。
3.1 抗滑穩(wěn)定計算
采用理正邊坡穩(wěn)定分析軟件,對邊坡的抗滑穩(wěn)定性進行計算。在計算過程中,根據(jù)不同的條件,可分別采用有效應力法或總應力法:總應力法應用于施工期是上游死水位工況;有效應力法和總應力法同時用于水位降落期;有效應力法均用于穩(wěn)定滲流期。由表3 穩(wěn)定計算成果可知,河道邊坡滿足穩(wěn)定要求[5 ]。
3.2 河道沖刷深度
沖刷深度:(4)式中:n為與防護岸坡在平面上的形狀有關系數(shù),n=14;vH為河道允許的不沖流速;vp為河道平均流速;hp為沖刷后水深。其中:hp=ph(5)式中:h為沖刷前水深;p為系數(shù)。
4 攔河壩設計
為攔截泥沙,增加河道景觀,形成景觀水面,在該河道新建攔水壩5 座。攔河壩壩體采用M10 漿砌石駝峰堰,壩高1.5m,壩體采用1 ∶3 水泥砂漿砌筑毛石基礎,壩體基礎采用厚100mm的C15 混凝土墊層。
4.1 攔河壩寬
根據(jù)《溢洪道設計規(guī)范》(SL253 -2000)和《水力計算手冊》,攔河壩寬[6 ]:(6)式中:Q為流量,m3/s,Q=135m3/s;H0 為計入總流速水頭的堰上水頭,H0=2.6m;ε為閘墩側(cè)收縮系數(shù),ε=1;m為流量系數(shù)。P1/H0 >0.34 ,m=0.452(P1/H0)-0.032 經(jīng)計算,攔河壩寬B=10m。
4.2 壩體穩(wěn)定分析
采用《漿砌石壩設計規(guī)范》(SL25 -1991)中所提供計算公式:新砌M10 漿砌石,f1 取0.6 ,C1 取50 ×104Pa。應用《水利水電工程PC―1500 程序集》計算:在正常情況下:K=1.81 >[1.15 ];在非常情況下:K=1.55 >[1.00 ],表明壩體抗滑穩(wěn)定安全系數(shù)均滿足規(guī)范要求。5 結(jié)論1)河道設計底寬16m,邊坡高3m,設計水深2m,斷面形式為梯形,采用1 ∶3 土質(zhì)邊坡。河道兩岸防洪水位以下采用賓格石籠邊坡護砌,防洪水位以上采用草皮護坡,河道上河口種植垂柳綠化,垂柳種植株距3m,擬種植垂柳500 株,垂柳胸徑7cm。2)施工完工期、水位降落期、穩(wěn)定滲流期的計算邊坡滑動安全系數(shù)均滿足河道邊坡的穩(wěn)定性要求,河道沖刷深度總深度0.63m3)河壩壩高1.5m,壩寬10m,壩體采用1 ∶3 水泥砂漿砌筑毛石基礎,壩體基礎采用厚100mm的C15 混凝土墊層。在正常情況與非常情況下,壩體抗滑穩(wěn)定安全系數(shù)均滿足要求。
參考文獻
[1 ]廖平安.北京市中小河流治理技術探討[J].中國水土保持,2014(1):11 -13.
[2 ]孫飛云,林魯生,董紫君,等.龍崗河干流綜合治理工程生態(tài)修復設計與應用[J].水利水電技術,2012 ,43(8):103 -106.
[3 ]賴永輝.龍?zhí)逗于橄露魏拥郎鷳B(tài)整治水力計算[J].水利水運工程學報,2011(1):92 -96.
[4 ]劉向榮,彭藝藝,余潤生,等.柳州竹鵝溪河道綜合整治工程設計[J].中國給水排水,2010 ,26(4):38 -41.
篇4
關鍵詞:南水北調(diào);地震液化;邊坡穩(wěn)定;地質(zhì)評價
中圖分類號:F416.9 文獻標識碼:A
南水北調(diào)工程是一項宏偉的跨流域調(diào)水工程,工程實施后將極大地緩解北方地區(qū)水資源緊缺的狀況。配套工程是南水北調(diào)工程體系的重要組成部分,承擔著連接中線總干渠和受水區(qū)地表水廠的紐帶作用。
石家莊市南水北調(diào)工程受水區(qū)地處河北省中南部太行山山前傾斜平原的前緣,涉及石家莊市整個平原區(qū)。其中元氏-趙縣輸水管道全長約23.733km,中途穿越河,管線采用單管重力輸水方式,管徑1.0~1.6m,設計流量0.92~1.64 m3/s,管道挖深約3.0~9.0m,渠首埋深較大,向下游逐漸變淺。
1、地質(zhì)概況
1.1地形地貌
元氏-趙縣管線位于太行山山前傾斜平原區(qū),地勢西高東低,京廣鐵路以西地面高程64.5~82.5m;以東相對較平坦,地面高程64.5~43.5m。管線所穿越的河為平原型河道,河谷形態(tài)呈“U”字型,河床寬而淺,河漫灘與階地不明顯。
1.2地層巖性
元氏-趙縣管線地層巖性為第四系全新統(tǒng)沖洪積(Q)的壤土、砂壤土(透鏡體)、粘土(透鏡體)及砂層(粉細砂、中粗砂)。其中壤土層呈褐黃~棕黃色,硬塑~可塑,管道沿線廣泛分布,垂向空間上主要位于表層。砂層呈棕黃~灰黃色,稍濕,稍密~中密,廣泛分布下部(多位于現(xiàn)狀地面約12m以下)。
1.3氣象水文
工程區(qū)屬暖溫帶大陸性季風氣候,四季分明,春季干旱多風,夏季濕潤多雨、雨量集中,秋季天高氣爽、降雨漸少,冬季寒冷少雪。多年平均氣溫12.4~13.3℃;全年1月份溫度最低,月平均氣溫-2.6~-4.3℃;6、7月份氣溫最高,月平均氣溫26.0~26.6℃。沿線同期氣溫比較接近,多年平均降水量508~583mm,無霜期自190~205d不等。
管道沿線地下水埋深較深,均在20m以下,勘探深度內(nèi)未見地下水。河河水對混凝土具弱腐蝕性,對鋼結(jié)構(gòu)具弱腐蝕性。
1.4地質(zhì)構(gòu)造與地震
工程區(qū)位于一級構(gòu)造單元的中朝準地臺,二級構(gòu)造單元的華北斷坳,三級構(gòu)造單元太行山隆起和河北斷陷的接觸帶部位。附近主要有井陘~長冶斷裂、石家莊斷裂、元氏斷裂,其中元氏斷裂與管道相交于河以西。上述斷裂皆為新構(gòu)造隱伏斷裂,第四紀以來活動微弱,對工程無大影響。
工程區(qū)所屬的元氏縣地震動峰值加速度為0.05g,抗震設防烈度為6度,趙縣地震動峰值加速度為0.10g,抗震設防烈度為7度,建筑場地類別為Ⅱ類。
1.5物理地質(zhì)現(xiàn)象
管道沿線為山前平原區(qū),與農(nóng)用水渠交叉較多,水渠一般窄而淺,工程開挖埋管后不會相互影響。除雨季溝坎部位易形成沖溝外,未發(fā)現(xiàn)其它不良物理地質(zhì)現(xiàn)象。本區(qū)多年最大凍土厚度50~60cm。
2、主要工程地質(zhì)問題及評價
2.1地震液化問題及評價
工程區(qū)趙縣段地震基本烈度為7度,設計基本地震加速度值為0.10g,因存在大量砂壤土、粉砂、中砂、細砂、粗砂層和粘粒含量小于16%的土層,初步判定有液體可能性。采用標準貫入錘擊數(shù)法對初判有液化可能性的無粘性和少粘性土進行復判,結(jié)果為:當發(fā)生7度及以上地震且地下水位上升到地表以下3m時,粘粒含量低的壤土、砂壤土及砂層存在地震液化的可能。
但考慮多年來本地區(qū)地下水位呈下降趨勢,工程運用期間地下水位上升到近地表、使地層達到飽和的可能性不大,因此實際運用中可不考慮地震液化的影響。
2.2邊坡穩(wěn)定問題及評價
元氏-趙縣輸水管道開挖深度3.0~9.0m范圍內(nèi),邊坡及管底巖性大部分為壤土、局部為砂壤土、粉砂,邊坡穩(wěn)定性較好。臨時邊坡坡比建議值:坡高≤5m時為1:0.75~1:1;坡高>5m時為1:1.5,視具體情況決定是否增加馬道。
建議坡頂減少重物堆載,禁止重車通行,施工過程中應派專職人員沿途巡視臨時邊坡的穩(wěn)定性,確保工程和人員安全。
2.3地基不均勻沉降問題及評價
輸水管道管底地層較均一,多為壤土,局部為砂壤土,二者物理力學性質(zhì)相近,地基承載力相差無幾,不易產(chǎn)生不均勻沉降問題。
2.4環(huán)境水問題及評價
勘察期間未見地下水,工程施工期間地下水上升的可能性不大。河河道內(nèi)存在地表水,雖然河底地層為壤土,屬相對不透水層,但穿越河施工仍應考慮排水問題。
水質(zhì)簡分析成果表明:河河水類型為重碳酸硫酸鈉鈣型水,對混凝土、鋼筋混凝土結(jié)構(gòu)中的鋼筋和鋼結(jié)構(gòu)均具弱腐蝕性,故應采取必要的抗腐蝕措施。
2.5管道抗沖刷問題及評價
穿越河主河槽段,管底上部約有2.0~3.0m厚的壤土、砂壤土層和厚約1.0m的粉砂層,壤土層液性指數(shù)IL建議值0.25,砂壤土層液性指數(shù)IL建議值0.18,工程設計時應根據(jù)相應參數(shù)計算抗沖刷深度,確保管道正常運用。
2.6土的腐蝕性問題及評價
輸水管線埋管深度范圍內(nèi)土體進行了土腐蝕性試驗和土壤電化學侵蝕性(土壤電阻率)地球物理勘探試驗,結(jié)果表明:埋管深度內(nèi)的土對混凝土結(jié)構(gòu)具微腐蝕性,對鋼筋混凝土結(jié)構(gòu)中的鋼筋具微~弱腐蝕性,對鋼結(jié)構(gòu)具弱~中等腐蝕性,從工程安全角度考慮,建議輸水管道全線采取抗腐蝕措施,尤其應注意穿越河段的抗腐蝕問題。
3、結(jié)語
元氏-趙縣輸水管線地質(zhì)結(jié)構(gòu)主要為粘性土單一結(jié)構(gòu),局部為粘夾砂或粘砂雙層結(jié)構(gòu),管底主要位于壤土層中,該層承載力建議值120 kPa,壓縮模量建議值7.2~7.8 MPa,具中等壓縮性,工程地質(zhì)條件較好;管道基槽挖深約3.0~9.0m,地下水位埋深大于20m,不存在施工排水問題;工程設計時應注意水、土對管材的腐蝕性問題,當采用鋼管或球墨鑄鐵管時,應做好防腐措施,確保工程安全。
參考文獻:
[1]GB 50487-2008,水利水電工程地質(zhì)勘察規(guī)范[S]
篇5
關鍵詞:平水河水庫;大壩設計;探討
1 基本概況
平水河水庫工程位于云南省瀾滄拉祜族自治縣;該縣位于云南省西南部,是全國唯一的拉祜族自治縣,也是一個多民族的山區(qū)貧困縣,全縣轄20個鄉(xiāng)(鎮(zhèn))、158個村(居)委會,總?cè)丝?9.41萬人。全縣國土面積8807km2,有林業(yè)用地面積806萬畝,森林覆蓋率為55.91%。全縣水庫控制灌溉面積7.98萬畝,共建有大小引水溝渠13869條,灌溉面積24.66萬畝,2010年現(xiàn)有水利工程年實際供水能力25028萬m3,占全縣水資源總量的3.0%,工程型缺水嚴重。本工程位于瀾滄縣東北部的大山鄉(xiāng)平水村,芒海河右岸一級支流平水河上游段,平水河徑流面積48.4km2,水庫壩址以上控制流域徑流面積11km2,河長6.81km,河道比降49.2‰,水庫流域多年平均降雨量為1600mm,多年平均年徑流量764萬m3。全鄉(xiāng)轄8個村民委員會,152個村民小組,3976戶,16169人,其中,農(nóng)業(yè)人口15727人,實有耕地面積40848畝,其中水田16230畝,旱地24618畝,目前保灌面積897畝,只占到灌區(qū)總耕地面積1.31萬畝的7.5%,大部分耕地灌溉用水無保證。全鄉(xiāng)農(nóng)村經(jīng)濟總收入2443萬元。流域內(nèi)經(jīng)濟發(fā)展落后,區(qū)域面積小,耕地零散,水域分散,蓄水工程設施少,基本靠天吃飯,農(nóng)業(yè)灌溉用水無保障,煙區(qū)集鎮(zhèn)居民飲水困難,因此,修建平水河水庫工程十分必要。
2 工程任務和規(guī)模
水庫是一座以農(nóng)業(yè)灌溉為主,兼顧人畜飲水、集鎮(zhèn)供水的?。?)型水利工程。水庫總庫容378.3萬m3,設計灌溉面積1.31萬畝,主要分布在高程1400m~1965m范圍之間。水庫總供水量472.3萬m3,其中農(nóng)業(yè)灌溉供水量423.4萬m3,占總供水量的89.6 %,設計灌溉保證率75%;灌區(qū)人畜和集鎮(zhèn)生活供水量48.9萬m3,占總供水量的10.4%,設計供水保證率95%。
3 工程等別及設計標準
平水河水庫工程為Ⅳ等?。ㄒ唬┬退畮?。主要建筑物大壩、溢洪道、導流輸水隧洞按4級建筑物設計,樞紐次要建筑物、臨時建筑物、灌溉渠道及渠系建筑物均按5級建筑物設計。水庫設計洪水標準按30年一遇,校核洪水標準按300年一遇,消能防沖按20年一遇。
4 壩址區(qū)地質(zhì)條件簡介
壩址區(qū)為構(gòu)造剝蝕低中山峽谷地貌,谷底為侵蝕堆積河谷地貌。兩岸山頂高約2050m,河床高程為1940~1970m。兩岸地形呈不對稱“V”字型,兩側(cè)岸坡較陡,地形坡度45~55°。
由于壩址區(qū)地處Ⅸ度地震區(qū),根據(jù)《水利水電工程地質(zhì)勘察規(guī)范》(GB50487-2008)附錄P土的液化判別規(guī)定:“對于粒徑小于5mm的顆粒含量質(zhì)量百分率大于30%的土,其中粒徑小于0.005mm的顆粒含量質(zhì)量百分率(ρc)相應于地震動峰值加速度為0.10g、0.15g、0.20g、0.30g和0.40g分別不小于15%、16%、17%、18%、19%和20%時,可判為不液化”,結(jié)合顆分試驗成果,壩基內(nèi)全風化巖體,粒徑小于5mm的顆粒含量質(zhì)量百分率為100%,粒徑小于0.005mm顆粒含量質(zhì)量百分率為15.5~19.0%,小于20%,初判其有存在地震液化的可能性。經(jīng)現(xiàn)場標貫試驗成果分析(詳見下表),壩基地表5m以內(nèi)全風化砂土為液化砂土,壩基地表5m以下全風化砂土為不易液化砂土。
5 工程總體布置
平水河水庫樞紐工程主要建筑物有大壩、溢洪道、導流輸水隧洞。大壩為粘土心墻石碴壩,大壩壩頂高程2013.2m,上游側(cè)設1.0m高的鋼筋混凝土防浪墻,由于工程位于Ⅸ度區(qū),工程主要建造物按Ⅸ度設防,壩頂寬度為7.0m,壩高58.6m,壩頂軸線長194.8m。
溢洪道布置于右岸壩肩,緊靠大壩,由進口明渠、控制段、泄槽段、消力池、出口明渠及護岸6部分組成,總長212.2m。溢洪道設計洪水最大泄量(P=3.33%)為20.21m3/s,校核洪水位時最大泄量(P=0.33%)為31.93m3/s。
6 大壩設計及清基原則
6.1 大壩設計
(1)壩體設計。粘土心墻石碴壩方案攔河壩由上游堆石區(qū)、粘土心墻、上下游反濾層、棱體、上下游護坡、防浪墻及壩頂結(jié)構(gòu)等部分組成。大壩壩頂高程2013.2m,上游側(cè)設有高1.0m的鋼筋混凝土防浪墻,由于工程位于Ⅸ度區(qū),工程主要建筑物按Ⅸ度設防,故壩頂寬度為7.0m,壩高58.6m,壩頂長194.8m。上游壩坡自上而下1:2.0~1:2.2,下游壩坡自上而下1:2.0~1:2.2。(2)壩體分區(qū)。粘土心墻石碴壩全部壩殼料均來源于壩殼料料場,土料主要來自土料場,根據(jù)料場分布及料源情況、按壩體結(jié)構(gòu)布置、壩體各部位功能將大壩分為心墻、上下游反濾層、壩體、棱體、上下游護坡、防浪墻及壩頂結(jié)構(gòu)等部位,各部位按用料要求填筑,由于是Ⅸ地震區(qū),特別是下游坡,設計考慮在壩面采用大粒徑塊石填筑。(3)防滲心墻設計。防滲心墻頂高程心墻頂寬4.0m,上下游邊坡均為1:0.3,心墻基礎灌漿軸線處設厚度為0.8m寬為8m的C20砼墊層作為灌漿蓋板,并固結(jié)灌漿,固結(jié)灌漿在1/3壩高以上采用兩排,1/3壩高以下采用四排,固結(jié)灌漿軸線距壩軸線1.5m,孔距3m,孔深6m;心墻基礎其他部位在開挖后澆注厚度為0.4m的C20砼墊層將開挖部位封閉,減少基礎開挖后由于的進一步風化。(4)反濾過渡層設計。心墻上游面與壩殼風化料間設有二層水平寬度分別為2.0m的砂石混合過渡料,下游面與壩殼風化料間設置了二層平均水平寬分別為2.0m的反濾過渡料。反濾材料及過渡料均采用壩殼石碴料場下部弱風化開采料進行加工。反濾料、過渡料、心墻料、堆石料應保持相同填筑上升高度,并進行同時碾壓,層間結(jié)合面不得有本層最大粒徑的填筑料,以保證層間結(jié)合緊密。(5)堆石區(qū)設計。大壩上游壩體全部采用強弱石碴料進行填筑,但下游壩體在高程1973.2m處進行分區(qū),高程1973.2m以上采用強弱石碴料填筑,高程1973.2m以下采用弱石碴料填筑,利于壩體下游排水。
6.2 清基原則
篇6
關鍵字:粘土心墻堆石壩 深厚覆蓋層 壩基處理
1 概況
瀘定水電站壩址位于四川省瀘定縣城瀘定橋上游2km處,距下游瀘定縣城2.5km,距上游瓦斯河口約17km,控制流域面積58943 km2。瀘定水電站采用壩式開發(fā),開發(fā)任務主要為發(fā)電。瀘定水電站水庫正常蓄水位1378.00m,校核洪水位1381.22m,死水位1375.00m,總庫容2.4億m3,調(diào)節(jié)庫容0.22億m3,具有日調(diào)節(jié)性能,裝機容量920MW。工程樞紐主要由擋水建筑物、泄洪建筑物、引水發(fā)電建筑物組成。
瀘定水電站粘土心墻堆石壩最大壩高79.5m,壩頂高程1385.50m,壩頂寬度12.0m,壩頂長度526.7m。大壩上、下游側(cè)坡度1:2.0。心墻頂寬4.0m,心墻上、下游坡度均為1:0.25,心墻上、下游側(cè)均設反濾層,上游在1374.00m高程以下設一層6.0m厚的反濾層,1374.00m高程以上設兩層各為3.0m厚的反濾層,下游設兩層各為4.0m厚的反濾層。上、下游反濾層與壩殼堆石間設過渡層,過渡層厚度上、下游均為12.0m,與壩殼堆石接觸面坡度為坡1:0.25,壩體上游設壓重。大壩抗震設防烈度為VIII度,為了增強壩頂結(jié)構(gòu)的抗震穩(wěn)定性,在1350.00m高程以上的過渡料和堆石料區(qū)域內(nèi)設置土工格柵,垂直間距2.0m。
2 壩區(qū)工程地質(zhì)條件
壩址區(qū)河谷覆蓋層深厚,最大厚度148.6m,層次結(jié)構(gòu)復雜。根據(jù)物質(zhì)組成、分布情況、成因及形成時代等,河谷及岸坡覆蓋層自下而上主要分為以下四層七個亞層:
第①層:漂(塊)卵(碎)礫石層。系冰水堆積(fglQ3),厚度51.85~75.31m,頂板埋深62.2~81.8m。粗顆粒成分以弱風化花崗巖、閃長巖為主,少量輝綠巖;次圓~次棱角狀。漂(塊)石粒徑多為25~40cm,約占20%~25%;卵(碎)石占45%~55%,粒徑以3~8cm為主;礫石粒徑0.5~1cm,含量約10%;砂以中~細砂為主,充填于粗顆粒間,局部呈透鏡狀展布,結(jié)構(gòu)密實,滲透系數(shù)k=2.0×10-2 cm/s~8.96×10-4 cm/s,屬強~中等透水性。天然干密度平均值ρd=1.99g/cm3;小于5mm顆粒含量為41.00%~17.00%;壓縮模量Es=68.3 MPa,
屬低壓縮性土,抗剪強度C=0.030MPa,φ=38.4°。
②-1亞層:漂(塊)卵(碎)礫石層。厚度26.25~28.06m,頂板埋深46.2~56.8m。物質(zhì)組成及性狀與第①層基本相同,屬強~中等透水。天然干密度ρd=1.58g/cm3~2.13g/cm3;小于5mm顆粒含量為59.47%,變形模量E0=41.84 MPa。
②-2亞層:碎(卵)礫石土層。呈灰綠色或灰黃色。厚8.2~79.45m,頂板埋深1.85~68.2m。碎(卵)石成份為閃長巖、花崗巖,次棱角狀為主,間有次圓~圓狀,碎(卵)石粒徑多1~4cm及6~8cm,約占30%~40%;礫石粒徑多<1cm,次棱角狀,約占10%~20%;余為粉砂土,含量35%~45%。局部見砂層或粉土層透鏡體,結(jié)構(gòu)較密實,滲透系數(shù)k=2.86×10-2cm/s~4.67×10-4 cm/s,屬強~中等透水性。天然干密度ρd=1.63g/cm3~1.96g/cm3;小于5mm顆粒含量平均為59.76%;壓縮模量Es=9~23.1MPa,屬中~低壓縮性土,C=0.015~0.020MPa,φ=17.9°~24.5°。
②-3亞層:粉細砂及粉土層,透鏡狀展布于上壩址河谷中下部。厚6.52~32.8m,頂板埋深29.68~39.36m。以粉、細砂為主,底部見粉土層。滲透系數(shù)k=4.85×10-5cm/s,鼠強~中等透水性;天然干密度為1.42g/cm3~1.94g/cm3;小于5mm顆粒含量平均為95.81%;承載力為0.226Mpa,變形模量E0=19.75 Mpa,壓縮模量Es=9.35MPa,屬中等壓縮性土,C=0.008MPa,φ=14.8°,抗剪強度較低。
③-1亞層:含漂(塊)卵(碎)礫石土層。展布于壩址區(qū)Ⅰ級階地和上壩址河谷右岸。厚度5.0~39.36m,頂板埋深0~39.36m。粗顆粒成分以弱風化花崗巖、閃長巖為主,少量輝綠巖,次圓~次棱角狀。漂塊石粒徑20~30cm,含量10%~20%;卵(碎)石粒徑以3~8cm為主,約占35%~45%;礫石粒徑0.5~1cm,含量約15%~25%;細粒以粉細砂或粉土為主,含量約20%~25%,局部呈透鏡狀成層產(chǎn)出,結(jié)構(gòu)較密實,滲透系數(shù)k=3.31×10-1cm/s~1.10×10-4cm/s,屬強~微弱透水性土;天然干密度為1.62g/cm3~2.24g/cm3;小于5mm顆粒含量為12.00%~65.00%;壓縮模量Es=8.8 MPa~192.6 MPa之間,屬中~低壓縮性土,C=0.02MPa~0.065MPa,φ=24.2°~47.4°,抗剪強度中等~中等偏上。
③-1b層透鏡體為含泥角礫中粗砂,呈透鏡狀展布。滲透系數(shù)k=6.92×10-5cm/s,屬弱透水性土。天然干密度為1.82g/cm3~1.89g/cm3,小于5mm顆粒含量為90.54%~97.13%,孔隙比為0.478~0.507,承載力為0.367Mpa,變形模量E0=39.59Mpa,壓縮模量Es= 13.70 MPa,屬中壓縮性土,C=0.011MPa,φ=17.3°,抗剪強度值較低。該透鏡體以細粒為主,力學性能較差。
③-2亞層:礫石砂層。不連續(xù)分布于上壩址橫Ⅱ線右岸Ⅰ級階地淺表部,厚度約8.3m,以中、粗砂為主,含量約70%;余為礫石,次圓狀為主。偶見粒徑3~7cm的卵石。滲透系數(shù)k=1×10-3cm/s~1×10-4cm/s,屬中等透水性。天然干密度為1.47g/cm3~1.55g/cm3,小于5mm顆粒粒徑含量為95.37%~100.00%;變形模量Es= 18 Mpa ~22 Mpa,C=0MPa,φ=17.3°。
第④層:沖積(alQ4)堆積之漂卵礫石層。分布于壩址區(qū)現(xiàn)代河床及漫灘。厚度5.6~25.5m。漂卵礫石成份以弱風化閃長巖、花崗巖為主,磨圓度較好,次圓~圓狀。漂石粒徑一般20~30cm,含量約15%~25%;卵石粒徑多為4~8cm及10~15cm,約占40%~50%;礫石粒徑多1~2cm,約占10%;砂為中細砂,局部見粉細砂層呈透鏡狀展布,結(jié)構(gòu)較密實。滲透系數(shù)k=1.65×10-1cm/s~2.21×10-1cm/s,屬強透水性。天然干密度為2.10g/cm3~2.27g/cm3,小于5mm顆粒粒徑含量為11.00%~35.00%;壓縮模量Es=64.9 MPa~192.6 MPa,屬低壓縮性土;C=0.06~0.08MPa,φ=41.2°~44.3°。
3 大壩基礎處理設計
3.1 壩基防滲處理設計
3.1.1 壩基防滲方案
覆蓋層地基上土石壩一般采用水平鋪蓋、垂直防滲等壩基防滲措施。瀘定大壩壩基表層④層漂卵礫石層為強透水層,前期考慮在上游建基面設復合土工膜水平鋪蓋與上游圍堰防滲墻連接,以延長滲徑、減小壩基滲漏損失和滲流坡降。招標、技施階段對壩基防滲方案進行了優(yōu)化,三維滲流有限元計算結(jié)果表明,上游復合土工膜水平鋪蓋對整個滲流場作用不大,水平防滲效果不明顯。同時,考慮到現(xiàn)場施工工藝、施工難度等因素,取消了上游建基面復合土工膜水平鋪蓋。壩基覆蓋層垂直防滲采用混凝土防滲墻,最大深度106.0m,墻厚1.0m。河床部位為懸掛式防滲墻,墻下設灌漿帷幕;左、右岸為封閉防滲墻。
大壩防滲系統(tǒng)由粘土心墻、壩基垂直防滲墻和灌漿帷幕、兩岸基巖帷幕組成。
3.1.2 混凝土防滲墻
壩基河床覆蓋層深厚,最大厚度148.6m,壩軸線處一般為120~130m。采用混凝土防滲墻是最為有效和經(jīng)濟的防滲措施。根據(jù)國內(nèi)防滲墻施工能力和本工程施工進度要求,本工程防滲墻深度為106.m,防滲墻封閉范圍為1306.00~1220.00m高程,防滲墻厚度1.0m,混凝土防滲墻實際承擔的最大滲透坡將為74。
三維應力應變計算表明,防滲墻的應力主要是由防滲墻兩側(cè)地基土的拖曳力和蓄水后上游水荷載引起的,防滲墻最大主應力為33.9Mpa,位于防滲墻底部右側(cè)與基巖接觸部位;在壩軸向河谷段右端基巖鼓包處出現(xiàn)了較大拉應力,最大值為-7.7MPa。根據(jù)計算分析和材料配比試驗,結(jié)合國內(nèi)已建工程經(jīng)驗,確定防滲墻設計參數(shù)如下:28天彈模不宜超過30000Mpa,180天彈模不宜超過35000Mpa,抗?jié)B等級W12,抗凍等級F100,墻體滲透系數(shù)小于1.0×10-7cm/s。
3.1.2 墻下灌漿帷幕
防滲墻底端至基巖40~50m深的覆蓋層地基采用帷幕灌漿處理,防滲墻底端置于覆蓋層①層之中,經(jīng)分析該層帷幕灌漿具有較好的可灌性,根據(jù)施工安排,帷幕灌漿須全部在灌漿廊道內(nèi)進行。經(jīng)三維滲流分析,確定采用3排帷幕,防滲帷幕采用均厚式帷幕,排距1.5m,帷幕厚度3~3.5m。防滲墻內(nèi)預埋一排灌漿管灌漿,呈梅花形布置,上、下游各設一排灌漿,距離防滲墻軸線距離均為1.5m。各排灌漿孔均進入基巖,中心一排深入基巖深度根據(jù)地質(zhì)條件情況按小于5Lu確定,其它排帷幕進入基巖深度2m。
3.2 心墻基礎開挖及處理
左岸心墻基礎為強風化、強卸荷閃長巖,天然坡度較陡。心墻防滲體與基巖接觸面需緊密結(jié)合,表層強風化巖石予以挖除。為適應地形,1340.00m高程以上基巖開挖坡比1:1,1340.00m高程以下基巖開挖坡比1:0.65。為防止基巖表層裂隙滲水、心墻與基巖接觸面產(chǎn)生接觸沖刷,在左岸心墻基礎設混凝土蓋板,最小厚度40cm。
右岸心墻基礎為覆蓋層,地形坡度相對較緩,為減少右岸心墻基礎覆蓋層開挖和心墻填筑量、節(jié)省投資,右岸心墻基礎建在覆蓋層上,同時挖除表層崩坡積、③-2礫石砂層和含漂(塊)卵(碎)礫石土層。河床部位心墻基礎表層砂層予以挖除,換填礫石料。
為提高左岸心墻基礎基巖不透水性、完整性,減小滲流坡降,減小滲漏損失;為降低由于河床和右岸心墻基礎覆蓋層不均勻變形或變形過大而引起的壩基灌漿廊道和混凝土防滲墻開裂、壩基灌漿廊道間相對位移過大的風險,在左岸心墻基巖基礎、河床和右岸心墻覆蓋層基礎固結(jié)灌漿處理,灌漿孔梅花形布置,間、排距3m,各部位深度為8m、10m或12m不等。
3.3壩基砂層處理
壩基砂類土體主要有③-2亞層、②-3亞層。其中③-2亞層埋深淺,分布范圍小,承載及抗變形能力低,難以滿足大壩基礎的要求,壩基開挖
將之清除。②-3亞層初判可能液化,砂層分析及處理措施主要圍繞②-3亞層展開。
3.3.1 壩基砂層液化分析
(1)天然地基液化分析
按《水利水電工程地質(zhì)勘察規(guī)范》(GB 50287-99),對②-3亞層的液化進行初判和復判。
初判:存在液化的可能性,需進行復判。
復判:②-3亞層的相對含水量為0.88,液性指數(shù)為0.74,3組相對密度成果為0.77~0.98,綜合判定②-3亞層在自然條件下為不液化砂土,復判標準與成果詳見表1。
(2)建壩后液化分析
采用簡化總應力法、二(三)維有限元分析法、總應力有限元法分析建壩后②-3粉細砂及粉土層的液化性。分析結(jié)果表明,設計工況與復核工況均不發(fā)生發(fā)生液化。遭遇100年超越概率2%地震時,下游壓重區(qū)與大壩基礎以下砂層液化安全率大于1。
3.3.2 壩基砂層處理設計
通過上述砂層液化分析及以往壩坡穩(wěn)定分
析結(jié)論,壩基砂層處理的原因不是砂層液化,而是控制壩體沉降及滿足壩坡穩(wěn)定要求。
預可、可研及招標階段根據(jù)《水電樞紐工程
等級劃分及設計安全標準(DL5180-2003)》6.0.4和6.0.6規(guī)定,瀘定粘土心墻壩按Ⅷ度設防,按50年超越概率10%的地震峰值加速度246.0cm/s2進行抗震設計,按50年超越概率5%的地震峰值加速度325.0cm/s2進行抗震穩(wěn)定復核。
技施階段對壩基砂層處理進行了優(yōu)化,開展了現(xiàn)場振沖生產(chǎn)性試驗,鉆孔過程中塌孔嚴重,成孔難度大,考慮到振沖施工難度大、工期緊、費用高,取消了振沖碎石樁處理方案。為了提高壩坡和壩基的抗滑穩(wěn)定性,提高②-3粉細砂及粉土層的上覆土體重量,在上游圍堰外設置壓重,
壩基②-3亞層粉細砂及粉土層地震液化經(jīng)驗判別表
表1
判別方法 判 別 標 準 壩基土體基本特性 判定 綜合判定
初
判 地層年代 第四紀晚更新世(Q3)或以前,不液化;全新世(Q4),可能液化 Q3(埋深27~39m以下) 不液化 可能液化
顆粒大小
(粘粒含量) 土中粘粒大于5mm質(zhì)量百分含量Pc≥70%可判為不液化;土中粘粒大于5mm質(zhì)量百分含量大于30%其中粘粒小于0.005mm質(zhì)量百分含量,相應于地震烈度8°分別不小于18%時,可判為不液化 粘粒含量多小于18% 可能液化
剪切波 土層的剪切波速度大于公式Vst= 計算的上限剪切波速度時,可判為不液化 剪切波速度為260~350m/s 可能液化
復
判 液性指數(shù) 液性指數(shù)IL≥ 0.75時,可能液化,否則不液化 液性指數(shù)IL=0.74 不液化 不液化
相對密度 地震烈度8°時,(Dr)cr大于75%不液化 相對密度(Dr)cr=77%~98% 不液化
相對含水量 相對含水量Wu≥ 0.9時,可能液化,否則不液化,塑性指數(shù)Ip≥ 7~10時不液化,Ip≤ 7~10時可能液化 相對含水量Wu=0.88 不液化
現(xiàn)場標準
貫入試驗 現(xiàn)場標貫N63.5擊數(shù)大于液化臨界Ncr值時不液化,否則液化 標貫N63.5擊數(shù)為3.36~35.7(變幅大),標準值fk 12.12 標貫深度
已超過15m
結(jié)果供參考
振動液化
試驗 地震設防烈度下,抗液化安全系數(shù)
K=τL/τav>1.0時不液化;否則可液化 地震加速度246.0cm/s2時Kmin=1.46;325.0cm/s2時Kmin=1.09; 不液化
上游壓重平臺高程1340.00m,順河向最大長度150.0m;同時下游堆石區(qū)范圍增大,在可研設計斷面下游壩腳設置堆石Ⅱ區(qū),平臺頂高程1346.00m,順河向最大長度130.0m。
4 結(jié)語
篇7
第一條為了保障*地震災后恢復重建工作有力、有序、有效地開展,積極、穩(wěn)妥恢復災區(qū)群眾正常的生活、生產(chǎn)、學習、工作條件,促進災區(qū)經(jīng)濟社會的恢復和發(fā)展,根據(jù)《中華人民共和國突發(fā)事件應對法》和《中華人民共和國防震減災法》,制定本條例。
第二條地震災后恢復重建應當堅持以人為本、科學規(guī)劃、統(tǒng)籌兼顧、分步實施、自力更生、國家支持、社會幫扶的方針。
第三條地震災后恢復重建應當遵循以下原則:
(一)受災地區(qū)自力更生、生產(chǎn)自救與國家支持、對口支援相結(jié)合;
(二)政府主導與社會參與相結(jié)合;
(三)就地恢復重建與異地新建相結(jié)合;
(四)確保質(zhì)量與注重效率相結(jié)合;
(五)立足當前與兼顧長遠相結(jié)合;
(六)經(jīng)濟社會發(fā)展與生態(tài)環(huán)境資源保護相結(jié)合。
第四條各級人民政府應當加強對地震災后恢復重建工作的領導、組織和協(xié)調(diào),必要時成立地震災后恢復重建協(xié)調(diào)機構(gòu),組織協(xié)調(diào)地震災后恢復重建工作。
縣級以上人民政府有關部門應當在本級人民政府的統(tǒng)一領導下,按照職責分工,密切配合,采取有效措施,共同做好地震災后恢復重建工作。
第五條地震災區(qū)的各級人民政府應當自力更生、艱苦奮斗、勤儉節(jié)約,多種渠道籌集資金、物資,開展地震災后恢復重建。
國家對地震災后恢復重建給予財政支持、稅收優(yōu)惠和金融扶持,并積極提供物資、技術和人力等方面的支持。
國家鼓勵公民、法人和其他組織積極參與地震災后恢復重建工作,支持在地震災后恢復重建中采用先進的技術、設備和材料。
國家接受外國政府和國際組織提供的符合地震災后恢復重建需要的援助。
第六條對在地震災后恢復重建工作中做出突出貢獻的單位和個人,按照國家有關規(guī)定給予表彰和獎勵。
第二章過渡性安置
第七條對地震災區(qū)的受災群眾進行過渡性安置,應當根據(jù)地震災區(qū)的實際情況,采取就地安置與異地安置,集中安置與分散安置,政府安置與投親靠友、自行安置相結(jié)合的方式。
政府對投親靠友和采取其他方式自行安置的受災群眾給予適當補助。具體辦法由省級人民政府制定。
第八條過渡性安置地點應當選在交通條件便利、方便受災群眾恢復生產(chǎn)和生活的區(qū)域,并避開地震活動斷層和可能發(fā)生洪災、山體滑坡和崩塌、泥石流、地面塌陷、雷擊等災害的區(qū)域以及生產(chǎn)、儲存易燃易爆危險品的工廠、倉庫。
實施過渡性安置應當占用廢棄地、空曠地,盡量不占用或者少占用農(nóng)田,并避免對自然保護區(qū)、飲用水水源保護區(qū)以及生態(tài)脆弱區(qū)域造成破壞。
第九條地震災區(qū)的各級人民政府根據(jù)實際條件,因地制宜,為災區(qū)群眾安排臨時住所。臨時住所可以采用帳篷、篷布房,有條件的也可以采用簡易住房、活動板房。安排臨時住所確實存在困難的,可以將學校操場和經(jīng)安全鑒定的體育場館等作為臨時避難場所。
國家鼓勵地震災區(qū)農(nóng)村居民自行籌建符合安全要求的臨時住所,并予以補助。具體辦法由省級人民政府制定。
第十條用于過渡性安置的物資應當保證質(zhì)量安全。生產(chǎn)單位應當確保帳篷、篷布房的產(chǎn)品質(zhì)量。建設單位、生產(chǎn)單位應當采用質(zhì)量合格的建筑材料,確保簡易住房、活動板房的安全質(zhì)量和抗震性能。
第十一條過渡性安置地點應當配套建設水、電、道路等基礎設施,并按比例配備學校、醫(yī)療點、集中供水點、公共衛(wèi)生間、垃圾收集點、日常用品供應點、少數(shù)民族特需品供應點以及必要的文化宣傳設施等配套公共服務設施,確保受災群眾的基本生活需要。
過渡性安置地點的規(guī)模應當適度,并安裝必要的防雷設施和預留必要的消防應急通道,配備相應的消防設施,防范火災和雷擊災害發(fā)生。
第十二條臨時住所應當具備防火、防風、防雨等功能。
第十三條活動板房應當優(yōu)先用于重災區(qū)和需要異地安置的受災群眾,倒塌房屋在短期內(nèi)難以恢復重建的重災戶特別是遇難者家庭、孕婦、嬰幼兒、孤兒、孤老、殘疾人員以及學校、醫(yī)療點等公共服務設施。
第十四條臨時住所、過渡性安置資金和物資的分配和使用,應當公開透明,定期公布,接受有關部門和社會監(jiān)督。具體辦法由省級人民政府制定。
第十五條過渡性安置用地按臨時用地安排,可以先行使用,事后再依法辦理有關用地手續(xù);到期未轉(zhuǎn)為永久性用地的,應當復墾后交還原土地使用者。
第十六條過渡性安置地點所在地的縣級人民政府,應當組織有關部門加強次生災害、飲用水水質(zhì)、食品衛(wèi)生、疫情的監(jiān)測和流行病學調(diào)查以及環(huán)境衛(wèi)生整治。使用的消毒劑、清洗劑應當符合環(huán)境保護要求,避免對土壤、水資源、環(huán)境等造成污染。
過渡性安置地點所在地的公安機關,應當加強治安管理,及時懲處違法行為,維護正常的社會秩序。
受災群眾應當在過渡性安置地點所在地的縣、鄉(xiāng)(鎮(zhèn))人民政府組織下,建立治安、消防聯(lián)隊,開展治安、消防巡查等自防自救工作。
第十七條地震災區(qū)的各級人民政府,應當組織受災群眾和企業(yè)開展生產(chǎn)自救,積極恢復生產(chǎn),并做好受災群眾的心理援助工作。
第十八條地震災區(qū)的各級人民政府及政府農(nóng)業(yè)行政主管部門應當及時組織修復毀損的農(nóng)業(yè)生產(chǎn)設施,開展搶種搶收,提供農(nóng)業(yè)生產(chǎn)技術指導,保障農(nóng)業(yè)投入品和農(nóng)業(yè)機械設備的供應。
第十九條地震災區(qū)的各級人民政府及政府有關部門應當優(yōu)先組織供電、供水、供氣等企業(yè)恢復生產(chǎn),并對大型骨干企業(yè)恢復生產(chǎn)提供支持,為全面恢復工業(yè)、服務業(yè)生產(chǎn)經(jīng)營提供條件。
第三章調(diào)查評估
第二十條國務院有關部門應當組織開展地震災害調(diào)查評估工作,為編制地震災后恢復重建規(guī)劃提供依據(jù)。
第二十一條地震災害調(diào)查評估應當包括下列事項:
(一)城鎮(zhèn)和鄉(xiāng)村受損程度和數(shù)量;
(二)人員傷亡情況,房屋破壞程度和數(shù)量,基礎設施、公共服務設施、工農(nóng)業(yè)生產(chǎn)設施與商貿(mào)流通設施受損程度和數(shù)量,農(nóng)用地毀損程度和數(shù)量等;
(三)需要安置人口的數(shù)量,需要救助的傷殘人員數(shù)量,需要幫助的孤寡老人及未成年人的數(shù)量,需要提供的房屋數(shù)量,需要恢復重建的基礎設施和公共服務設施,需要恢復重建的生產(chǎn)設施,需要整理和復墾的農(nóng)用地等;
(四)環(huán)境污染、生態(tài)損害以及自然和歷史文化遺產(chǎn)毀損等情況;
(五)資源環(huán)境承載能力以及地質(zhì)災害、地震次生災害和隱患等情況;
(六)水文地質(zhì)、工程地質(zhì)、環(huán)境地質(zhì)、地形地貌以及河勢和水文情勢、重大水利水電工程的受影響情況;
(七)突發(fā)公共衛(wèi)生事件及其隱患;
(八)編制地震災后恢復重建規(guī)劃需要調(diào)查評估的其他事項。
第二十二條縣級以上人民政府應當依據(jù)各自職責分工組織有關部門和專家,對毀損嚴重的水利、道路、電力等基礎設施,學校等公共服務設施以及其他建設工程進行工程質(zhì)量和抗震性能鑒定,保存有關資料和樣本,并開展地震活動對相關建設工程破壞機理的調(diào)查評估,為改進建設工程抗震設計規(guī)范和工程建設標準,采取抗震設防措施提供科學依據(jù)。
第二十三條地震災害調(diào)查評估應當采用全面調(diào)查評估、實地調(diào)查評估、綜合評估的方法,確保數(shù)據(jù)資料的真實性、準確性、及時性和評估結(jié)論的可靠性。
地震部門、地震監(jiān)測臺網(wǎng)應當收集、保存地震前、地震中、地震后的所有資料和信息,并建立完整的檔案。
開展地震災害調(diào)查評估工作,應當遵守國家法律、法規(guī)以及有關技術標準和要求。
第二十四條地震災害調(diào)查評估報告應當及時上報國務院。第四章恢復重建規(guī)劃
第二十五條國務院發(fā)展改革部門會同國務院有關部門與地震災區(qū)的省級人民政府共同組織編制地震災后恢復重建規(guī)劃,報國務院批準后組織實施。
地震災后恢復重建規(guī)劃應當包括地震災后恢復重建總體規(guī)劃和城鎮(zhèn)體系規(guī)劃、農(nóng)村建設規(guī)劃、城鄉(xiāng)住房建設規(guī)劃、基礎設施建設規(guī)劃、公共服務設施建設規(guī)劃、生產(chǎn)力布局和產(chǎn)業(yè)調(diào)整規(guī)劃、市場服務體系規(guī)劃、防災減災和生態(tài)修復規(guī)劃、土地利用規(guī)劃等專項規(guī)劃。
第二十六條地震災區(qū)的市、縣人民政府應當在省級人民政府的指導下,組織編制本行政區(qū)域的地震災后恢復重建實施規(guī)劃。
第二十七條編制地震災后恢復重建規(guī)劃,應當全面貫徹落實科學發(fā)展觀,堅持以人為本,優(yōu)先恢復重建受災群眾基本生活和公共服務設施;尊重科學、尊重自然,充分考慮資源環(huán)境承載能力;統(tǒng)籌兼顧,與推進工業(yè)化、城鎮(zhèn)化、新農(nóng)村建設、主體功能區(qū)建設、產(chǎn)業(yè)結(jié)構(gòu)優(yōu)化升級相結(jié)合,并堅持統(tǒng)一部署、分工負責,區(qū)分緩急、突出重點,相互銜接、上下協(xié)調(diào),規(guī)范有序、依法推進的原則。
編制地震災后恢復重建規(guī)劃,應當遵守法律、法規(guī)和國家有關標準。
第二十八條地震災后調(diào)查評估獲得的地質(zhì)、勘察、測繪、水文、環(huán)境等基礎資料,應當作為編制地震災后恢復重建規(guī)劃的依據(jù)。
地震工作主管部門應當根據(jù)地震地質(zhì)、地震活動特性的研究成果和地震烈度分布情況,對地震動參數(shù)區(qū)劃圖進行復核,為編制地震災后恢復重建規(guī)劃和進行建設工程抗震設防提供依據(jù)。
第二十九條地震災后恢復重建規(guī)劃應當包括地震災害狀況和區(qū)域分析,恢復重建原則和目標,恢復重建區(qū)域范圍,恢復重建空間布局,恢復重建任務和政策措施,有科學價值的地震遺址、遺跡保護,受損文物和具有歷史價值與少數(shù)民族特色的建筑物、構(gòu)筑物的修復,實施步驟和階段等主要內(nèi)容。
地震災后恢復重建規(guī)劃應當重點對城鎮(zhèn)和鄉(xiāng)村的布局、住房建設、基礎設施建設、公共服務設施建設、農(nóng)業(yè)生產(chǎn)設施建設、工業(yè)生產(chǎn)設施建設、防災減災和生態(tài)環(huán)境以及自然資源和歷史文化遺產(chǎn)保護、土地整理和復墾等做出安排。
第三十條地震災區(qū)的中央所屬企業(yè)生產(chǎn)、生活等設施的恢復重建,納入地震災后恢復重建規(guī)劃統(tǒng)籌安排。
第三十一條編制地震災后恢復重建規(guī)劃,應當吸收有關部門、專家參加,并充分聽取地震災區(qū)受災群眾的意見;重大事項應當組織有關方面專家進行專題論證。
第三十二條地震災區(qū)內(nèi)的城鎮(zhèn)和鄉(xiāng)村完全毀損,存在重大安全隱患或者人口規(guī)模超出環(huán)境承載能力,需要異地新建的,重新選址時,應當避開地震活動斷層或者生態(tài)脆弱和可能發(fā)生洪災、山體滑坡、崩塌、泥石流、地面塌陷等災害的區(qū)域以及傳染病自然疫源地。
地震災區(qū)的縣級以上地方人民政府應當組織有關部門、專家對新址進行論證,聽取公眾意見,并報上一級人民政府批準。
第三十三條國務院批準的地震災后恢復重建規(guī)劃,是地震災后恢復重建的基本依據(jù),應當及時公布。任何單位和個人都應當遵守經(jīng)依法批準公布的地震災后恢復重建規(guī)劃,服從規(guī)劃管理。
地震災后恢復重建規(guī)劃所依據(jù)的基礎資料修改、其他客觀條件發(fā)生變化需要修改的,或者因恢復重建工作需要修改的,由規(guī)劃組織編制機關提出修改意見,報國務院批準。
第五章恢復重建的實施
第三十四條地震災區(qū)的省級人民政府,應當根據(jù)地震災后恢復重建規(guī)劃和當?shù)亟?jīng)濟社會發(fā)展水平,有計劃、分步驟地組織實施地震災后恢復重建。
國務院有關部門應當支持、協(xié)助、指導地震災區(qū)的恢復重建工作。
城鎮(zhèn)恢復重建應當充分考慮原有城市、鎮(zhèn)總體規(guī)劃,注重體現(xiàn)原有少數(shù)民族建筑風格,合理確定城鎮(zhèn)的建設規(guī)模和標準,并達到抗震設防要求。
第三十五條發(fā)展改革部門具體負責災后恢復重建的統(tǒng)籌規(guī)劃、政策建議、投資計劃、組織協(xié)調(diào)和重大建設項目的安排。
財政部門會同有關部門負責提出資金安排和政策建議,并具體負責災后恢復重建財政資金的撥付和管理。
交通運輸、水利、鐵路、電力、通信、廣播影視等部門按照職責分工,具體組織實施有關基礎設施的災后恢復重建。
建設部門具體組織實施房屋和市政公用設施的災后恢復重建。
民政部門具體組織實施受災群眾的臨時基本生活保障、生活困難救助、農(nóng)村毀損房屋恢復重建補助、社會福利設施恢復重建以及對孤兒、孤老、殘疾人員的安置、補助、心理援助和傷殘康復。
教育、科技、文化、衛(wèi)生、廣播影視、體育、人力資源社會保障、商務、工商等部門按照職責分工,具體組織實施公共服務設施的災后恢復重建、衛(wèi)生防疫和醫(yī)療救治、就業(yè)服務和社會保障、重要生活必需品供應以及維護市場秩序。高等學校、科學技術研究開發(fā)機構(gòu)應當加強對有關問題的專題研究,為地震災后恢復重建提供科學技術支撐。
農(nóng)業(yè)、林業(yè)、水利、國土資源、商務、工業(yè)等部門按照職責分工,具體組織實施動物疫情監(jiān)測、農(nóng)業(yè)生產(chǎn)設施恢復重建和農(nóng)業(yè)生產(chǎn)條件恢復,地震災后恢復重建用地安排、土地整理和復墾、地質(zhì)災害防治,商貿(mào)流通、工業(yè)生產(chǎn)設施等恢復重建。
環(huán)保、林業(yè)、民政、水利、科技、安全生產(chǎn)、地震、氣象、測繪等部門按照職責分工,具體負責生態(tài)環(huán)境保護和防災減災、安全生產(chǎn)的技術保障及公共服務設施恢復重建。
中國人民銀行和銀行、證券、保險監(jiān)督管理機構(gòu)按照職責分工,具體負責地震災后恢復重建金融支持和服務政策的制定與落實。
公安部門具體負責維護和穩(wěn)定地震災區(qū)社會秩序。
海關、出入境檢驗檢疫部門按照職責分工,依法組織實施進口恢復重建物資、境外捐贈物資的驗放、檢驗檢疫。
外交部會同有關部門按照職責分工,協(xié)調(diào)開展地震災后恢復重建的涉外工作。
第三十六條國務院地震工作主管部門應當會同文物等有關部門組織專家對地震廢墟進行現(xiàn)場調(diào)查,對具有典型性、代表性、科學價值和紀念意義的地震遺址、遺跡劃定范圍,建立地震遺址博物館。
第三十七條地震災區(qū)的省級人民政府應當組織民族事務、建設、環(huán)保、地震、文物等部門和專家,根據(jù)地震災害調(diào)查評估結(jié)果,制定清理保護方案,明確地震遺址、遺跡和文物保護單位以及具有歷史價值與少數(shù)民族特色的建筑物、構(gòu)筑物等保護對象及其區(qū)域范圍,報國務院批準后實施。
第三十八條地震災害現(xiàn)場的清理保護,應當在確定無人類生命跡象和無重大疫情的情況下,按照統(tǒng)一組織、科學規(guī)劃、統(tǒng)籌兼顧、注重保護的原則實施。發(fā)現(xiàn)地震災害現(xiàn)場有人類生命跡象的,應當立即實施救援。
第三十九條對清理保護方案確定的地震遺址、遺跡應當在保護范圍內(nèi)采取有效措施進行保護,搶救、收集具有科學研究價值的技術資料和實物資料,并在不影響整體風貌的情況下,對有倒塌危險的建筑物、構(gòu)筑物進行必要的加固,對廢墟中有毒、有害的廢棄物、殘留物進行必要的清理。
對文物保護單位應當實施原址保護。對尚可保留的不可移動文物和具有歷史價值與少數(shù)民族特色的建筑物、構(gòu)筑物以及歷史建筑,應當采取加固等保護措施;對無法保留但將來可能恢復重建的,應當收集整理影像資料。
對館藏文物、民間收藏文物等可移動文物和非物質(zhì)文化遺產(chǎn)的物質(zhì)載體,應當及時搶救、整理、登記,并將清理出的可移動文物和非物質(zhì)文化遺產(chǎn)的物質(zhì)載體,運送到安全地點妥善保管。
第四十條對地震災害現(xiàn)場的清理,應當按照清理保護方案分區(qū)、分類進行。清理出的遇難者遺體處理,應當尊重當?shù)厣贁?shù)民族傳統(tǒng)習慣;清理出的財物,應當對其種類、特征、數(shù)量、清理時間、地點等情況詳細登記造冊,妥善保存。有條件的,可以通知遇難者家屬和所有權人到場。
對清理出的廢棄危險化學品和其他廢棄物、殘留物,應當實行分類處理,并遵守國家有關規(guī)定。
第四十一條地震災區(qū)的各級人民政府應當做好地震災區(qū)的動物疫情防控工作。對清理出的動物尸體,應當采取消毒、銷毀等無害化處理措施,防止重大動物疫情的發(fā)生。
第四十二條對現(xiàn)場清理過程中拆除或者拆解的廢舊建筑材料以及過渡安置期結(jié)束后不再使用的活動板房等,能回收利用的,應當回收利用。
第四十三條地震災后恢復重建,應當統(tǒng)籌安排交通、鐵路、通信、供水、供電、住房、學校、醫(yī)院、社會福利、文化、廣播電視、金融等基礎設施和公共服務設施建設。
城鎮(zhèn)的地震災后恢復重建,應當統(tǒng)籌安排市政公用設施、公共服務設施和其他設施,合理確定建設規(guī)模和時序。
鄉(xiāng)村的地震災后恢復重建,應當尊重農(nóng)民意愿,發(fā)揮村民自治組織的作用,以群眾自建為主,政府補助、社會幫扶、對口支援,因地制宜,節(jié)約和集約利用土地,保護耕地。
地震災區(qū)的縣級人民政府應當組織有關部門對村民住宅建設的選址予以指導,并提供能夠符合當?shù)貙嶋H的多種村民住宅設計圖,供村民選擇。村民住宅應當達到抗震設防要求,體現(xiàn)原有地方特色、民族特色和傳統(tǒng)風貌。
第四十四條經(jīng)批準的地震災后恢復重建項目可以根據(jù)土地利用總體規(guī)劃,先行安排使用土地,實行邊建設邊報批,并按照有關規(guī)定辦理用地手續(xù)。對因地震災害毀損的耕地、農(nóng)田道路、搶險救災應急用地、過渡性安置用地、廢棄的城鎮(zhèn)、村莊和工礦舊址,應當依法進行土地整理和復墾,并治理地質(zhì)災害。
第四十五條國務院有關部門應當組織對地震災區(qū)地震動參數(shù)、抗震設防要求、工程建設標準進行復審;確有必要修訂的,應當及時組織修訂。
地震災區(qū)的抗震設防要求和有關工程建設標準應當根據(jù)修訂后的地震災區(qū)地震動參數(shù),進行相應修訂。
第四十六條對地震災區(qū)尚可使用的建筑物、構(gòu)筑物和設施,應當按照地震災區(qū)的抗震設防要求進行抗震性能鑒定,并根據(jù)鑒定結(jié)果采取加固、改造等措施。
第四十七條地震災后重建工程的選址,應當符合地震災后恢復重建規(guī)劃和抗震設防、防災減災要求,避開地震活動斷層、生態(tài)脆弱地區(qū)、可能發(fā)生重大災害的區(qū)域和傳染病自然疫源地。
第四十八條設計單位應當嚴格按照抗震設防要求和工程建設強制性標準進行抗震設計,并對抗震設計的質(zhì)量以及出具的施工圖的準確性負責。
施工單位應當按照施工圖設計文件和工程建設強制性標準進行施工,并對施工質(zhì)量負責。
建設單位、施工單位應當選用施工圖設計文件和國家有關標準規(guī)定的材料、構(gòu)配件和設備。
工程監(jiān)理單位應當依照施工圖設計文件和工程建設強制性標準實施監(jiān)理,并對施工質(zhì)量承擔監(jiān)理責任。
第四十九條按照國家有關規(guī)定對地震災后恢復重建工程進行竣工驗收時,應當重點對工程是否符合抗震設防要求進行查驗;對不符合抗震設防要求的,不得出具竣工驗收報告。
第五十條對學校、醫(yī)院、體育場館、博物館、文化館、圖書館、影劇院、商場、交通樞紐等人員密集的公共服務設施,應當按照高于當?shù)胤课萁ㄖ目拐鹪O防要求進行設計,增強抗震設防能力。
第五十一條地震災后恢復重建中涉及文物保護、自然保護區(qū)、野生動植物保護和地震遺址、遺跡保護的,依照國家有關法律、法規(guī)的規(guī)定執(zhí)行。
第五十二條地震災后恢復重建中,貨物、工程和服務的政府采購活動,應當嚴格依照《中華人民共和國政府采購法》的有關規(guī)定執(zhí)行。
第六章資金籌集與政策扶持
第五十三條縣級以上人民政府應當通過政府投入、對口支援、社會募集、市場運作等方式籌集地震災后恢復重建資金。
第五十四條國家根據(jù)地震的強度和損失的實際情況等因素建立地震災后恢復重建基金,專項用于地震災后恢復重建。
地震災后恢復重建基金由預算資金以及其他財政資金構(gòu)成。
地震災后恢復重建基金籌集使用管理辦法,由國務院財政部門制定。
第五十五條國家鼓勵公民、法人和其他組織為地震災后恢復重建捐贈款物。捐贈款物的使用應當尊重捐贈人的意愿,并納入地震災后恢復重建規(guī)劃。
縣級以上人民政府及其部門作為受贈人的,應當將捐贈款物用于地震災后恢復重建。公益性社會團體、公益性非營利的事業(yè)單位作為受贈人的,應當公開接受捐贈的情況和受贈財產(chǎn)的使用、管理情況,接受政府有關部門、捐贈人和社會的監(jiān)督。
縣級以上人民政府及其部門、公益性社會團體、公益性非營利的事業(yè)單位接受捐贈的,應當向捐贈人出具由省級以上財政部門統(tǒng)一印制的捐贈票據(jù)。
外國政府和國際組織提供的地震災后恢復重建資金、物資和人員服務以及安排實施的多雙邊地震災后恢復重建項目等,依照國家有關規(guī)定執(zhí)行。
第五十六條國家鼓勵公民、法人和其他組織依法投資地震災區(qū)基礎設施和公共服務設施的恢復重建。
第五十七條國家對地震災后恢復重建依法實行稅收優(yōu)惠。具體辦法由國務院財政部門、國務院稅務部門制定。
地震災區(qū)災后恢復重建期間,縣級以上地方人民政府依法實施地方稅收優(yōu)惠措施。
第五十八條地震災區(qū)的各項行政事業(yè)性收費可以適當減免。具體辦法由有關主管部門制定。
第五十九條國家向地震災區(qū)的房屋貸款和公共服務設施恢復重建貸款、工業(yè)和服務業(yè)恢復生產(chǎn)經(jīng)營貸款、農(nóng)業(yè)恢復生產(chǎn)貸款等提供財政貼息。具體辦法由國務院財政部門會同其他有關部門制定。
第六十條國家在安排建設資金時,應當優(yōu)先考慮地震災區(qū)的交通、鐵路、能源、農(nóng)業(yè)、水利、通信、金融、市政公用、教育、衛(wèi)生、文化、廣播電視、防災減災、環(huán)境保護等基礎設施和公共服務設施以及關系國家安全的重點工程設施建設。
測繪、氣象、地震、水文等設施因地震遭受破壞的,地震災區(qū)的人民政府應當采取緊急措施,組織力量修復,確保正常運行。
第六十一條各級人民政府及政府有關部門應當加強對受災群眾的職業(yè)技能培訓、就業(yè)服務和就業(yè)援助,鼓勵企業(yè)、事業(yè)單位優(yōu)先吸納符合條件的受災群眾就業(yè);可以采取以工代賑的方式組織受災群眾參加地震災后恢復重建。
第六十二條地震災區(qū)接受義務教育的學生,其監(jiān)護人因地震災害死亡或者喪失勞動能力或者因地震災害導致家庭經(jīng)濟困難的,由國家給予生活費補貼;地震災區(qū)的其他學生,其父母因地震災害死亡或者喪失勞動能力或者因地震災害導致家庭經(jīng)濟困難的,在同等情況下其所在的學??梢詢?yōu)先將其納入國家資助政策體系予以資助。
第六十三條非地震災區(qū)的縣級以上地方人民政府及其有關部門應當按照國家和當?shù)厝嗣裾陌才?,采取對口支援等多種形式支持地震災區(qū)恢復重建。
國家鼓勵非地震災區(qū)的企業(yè)、事業(yè)單位通過援建等多種形式支持地震災區(qū)恢復重建。
第六十四條對地震災后恢復重建中需要辦理行政審批手續(xù)的事項,有審批權的人民政府及有關部門應當按照方便群眾、簡化手續(xù)、提高效率的原則,依法及時予以辦理。
第七章監(jiān)督管理
第六十五條縣級以上人民政府應當加強對下級人民政府地震災后恢復重建工作的監(jiān)督檢查。
縣級以上人民政府有關部門應當加強對地震災后恢復重建建設工程質(zhì)量和安全以及產(chǎn)品質(zhì)量的監(jiān)督。
第六十六條地震災區(qū)的各級人民政府在確定地震災后恢復重建資金和物資分配方案、房屋分配方案前,應當先行調(diào)查,經(jīng)民主評議后予以公布。
第六十七條地震災區(qū)的各級人民政府應當定期公布地震災后恢復重建資金和物資的來源、數(shù)量、發(fā)放和使用情況,接受社會監(jiān)督。
第六十八條財政部門應當加強對地震災后恢復重建資金的撥付和使用的監(jiān)督管理。
發(fā)展改革、建設、交通運輸、水利、電力、鐵路、工業(yè)和信息化等部門按照職責分工,組織開展對地震災后恢復重建項目的監(jiān)督檢查。國務院發(fā)展改革部門組織開展對地震災后恢復重建的重大建設項目的稽察。
第六十九條審計機關應當加強對地震災后恢復重建資金和物資的籌集、分配、撥付、使用和效果的全過程跟蹤審計,定期公布地震災后恢復重建資金和物資使用情況,并在審計結(jié)束后公布最終的審計結(jié)果。
第七十條地震災區(qū)的各級人民政府及有關部門和單位,應當對建設項目以及地震災后恢復重建資金和物資的籌集、分配、撥付、使用情況登記造冊,建立、健全檔案,并在建設工程竣工驗收和地震災后恢復重建結(jié)束后,及時向建設主管部門或者其他有關部門移交檔案。
第七十一條監(jiān)察機關應當加強對參與地震災后恢復重建工作的國家機關和法律、法規(guī)授權的具有管理公共事務職能的組織及其工作人員的監(jiān)察。
第七十二條任何單位和個人對地震災后恢復重建中的違法違紀行為,都有權進行舉報。
接到舉報的人民政府或者有關部門應當立即調(diào)查,依法處理,并為舉報人保密。實名舉報的,應當將處理結(jié)果反饋舉報人。社會影響較大的違法違紀行為,處理結(jié)果應當向社會公布。
第八章法律責任
第七十三條有關地方人民政府及政府部門侵占、截留、挪用地震災后恢復重建資金或者物資的,由財政部門、審計機關在各自職責范圍內(nèi),責令改正,追回被侵占、截留、挪用的地震災后恢復重建資金或者物資,沒收違法所得,對單位給予警告或者通報批評;對直接負責的主管人員和其他直接責任人員,由任免機關或者監(jiān)察機關按照人事管理權限依法給予降級、撤職直至開除的處分;構(gòu)成犯罪的,依法追究刑事責任。
第七十四條在地震災后恢復重建中,有關地方人民政府及政府有關部門拖欠施工單位工程款,或者明示、暗示設計單位、施工單位違反抗震設防要求和工程建設強制性標準,降低建設工程質(zhì)量,造成重大安全事故,構(gòu)成犯罪的,依法追究刑事責任;尚不構(gòu)成犯罪的,對直接負責的主管人員和其他直接責任人員,由任免機關或者監(jiān)察機關按照人事管理權限依法給予降級、撤職直至開除的處分。
第七十五條在地震災后恢復重建中,建設單位、勘察單位、設計單位、施工單位或者工程監(jiān)理單位,降低建設工程質(zhì)量,造成重大安全事故,構(gòu)成犯罪的,依法追究刑事責任;尚不構(gòu)成犯罪的,由縣級以上地方人民政府建設主管部門或者其他有關部門依照《建設工程質(zhì)量管理條例》的有關規(guī)定給予處罰。
第七十六條對毀損嚴重的基礎設施、公共服務設施和其他建設工程,在調(diào)查評估中經(jīng)鑒定確認工程質(zhì)量存在重大問題,構(gòu)成犯罪的,對負有責任的建設單位、設計單位、施工單位、工程監(jiān)理單位的直接責任人員,依法追究刑事責任;尚不構(gòu)成犯罪的,由縣級以上地方人民政府建設主管部門或者其他有關部門依照《建設工程質(zhì)量管理條例》的有關規(guī)定給予處罰。涉嫌行賄、受賄的,依法追究刑事責任。